Email: nafi9876789@gmail.com
Contact: +13478831144
Academic Projects
-
Integration of Safety Risk Factor and Optimization of Scaffolding Plans in BIM for Construction Safety, KUET.-Case Study
(September 2018- February 2019)
o Assessing the application of BIM in construction safety.
o Comparing between automated approach and manual approach.
o Mitigating scaffolding failure risk through BIM.
![pj 2_edited.jpg](https://static.wixstatic.com/media/8b21bf_3cdd2e3439a34939bcefbd957a427895~mv2.jpg/v1/fill/w_517,h_388,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/pj%202_edited.jpg)
![p1 jpg.JPG](https://static.wixstatic.com/media/8b21bf_d25420c170fb46a391ebeb63b7038632~mv2.jpg/v1/fill/w_600,h_341,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/p1%20jpg_JPG.jpg)
-
Implementing BIM Platforms in Project Life-Cycle, KUET.
(August 2019-January 2020)
o Using Autodesk Revit, Navisworks, Design Review for project preparation
o Using Autodesk Robot for structural calculation.
o Solo project.
![7.PNG](https://static.wixstatic.com/media/8b21bf_8249ce2bdc4947698da83690dfef7953~mv2.png/v1/fill/w_600,h_320,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/7_PNG.png)
![Capture2.PNG](https://static.wixstatic.com/media/8b21bf_d4a31228167f42708d50e47303e93271~mv2.png/v1/fill/w_600,h_323,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Capture2_PNG.png)
![1.PNG](https://static.wixstatic.com/media/8b21bf_9fdbfb957ec04346b8e470ae6cd2eb7e~mv2.png/v1/fill/w_60,h_32,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/1_PNG.png)
-
Analyzing Building Safety and Structural Health, KUET.
(August 2019-December 2020)
o OSHA regulations for building safety.
o Structural health monitoring with Rebound Hammer, Ultrasonic Pulse Velocity Machine and Rebar Scanner.
![Screenshot_20211025_110149_com.huawei.himovie_edited.jpg](https://static.wixstatic.com/media/8b21bf_3c06de120cbf45bf8951e73ca831b2f5~mv2.jpg/v1/fill/w_105,h_94,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Screenshot_20211025_110149_com_huawei_himovie_edited.jpg)
![IMG_20191211_160235_edited.jpg](https://static.wixstatic.com/media/8b21bf_e0f1de683fc24abca4af620ddfc6647b~mv2.jpg/v1/fill/w_105,h_69,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/IMG_20191211_160235_edited.jpg)
![Screenshot_20211025_110216_com.android_edited.jpg](https://static.wixstatic.com/media/8b21bf_a9fddace752744de9b5df29253613753~mv2.jpg/v1/fill/w_103,h_93,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Screenshot_20211025_110216_com_android_edited.jpg)
![Screenshot_20211025_110157_com.huawei.himovie_edited.jpg](https://static.wixstatic.com/media/8b21bf_3898539713a048eaa48d0c1f3fed328f~mv2.jpg/v1/crop/x_0,y_45,w_688,h_457/fill/w_107,h_71,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Screenshot_20211025_110157_com_huawei_himovie_edited.jpg)
-
Case Study on High-Rise Structures: Shanghai Tower, China.
(February 2018-May 2018)
o Detailed assessment of the structure.
o Sustainability analysis.
o Poster presentation.
![st 1.JPG](https://static.wixstatic.com/media/8b21bf_cbf6d8c0025c46b08c3d56d2e0380a54~mv2.jpg/v1/fill/w_108,h_52,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/st%201_JPG.jpg)
![st2.JPG](https://static.wixstatic.com/media/8b21bf_efcdbba45ea7474f82cd43446e7d08a4~mv2.jpg/v1/fill/w_98,h_55,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/st2_JPG.jpg)
-
Implementation of Project Management in Building Construction, KUET.
(February 2019-August 2019)
o Project planning, cost estimation.
o Scheduling of Project using MS Project.
o Tender and contract preparation.
![dummy powerpoint clash.png](https://static.wixstatic.com/media/8b21bf_c44ee73513a5485d9c6009853f7e950d~mv2.png/v1/fill/w_105,h_105,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/dummy%20powerpoint%20clash.png)
![p51.JPG](https://static.wixstatic.com/media/8b21bf_eca0c8e21eb940a1b0407048a491fc0f~mv2.jpg/v1/fill/w_108,h_54,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/p51_JPG.jpg)